Plan-Gap & Constructability Review
Plans with missing details, conflicts between sheets or work nobody drew are where many surprise costs start. We read your plans the way a builder would, sheet by sheet and detail back to plan, and give you a list of gaps, conflicts and constructability concerns, written as RFIs for your design team to answer before the job is bid or built.

Who it's for
- Owners and developers with plans at the design development or permit stage
- Architects and engineers who want a contractor's constructability read before bidding
- Owners whose plans were permitted but feel incomplete
How the work goes
- A first conversation about the project, the design stage and your timeline.
- Send the current plan set, specifications, soils and structural reports, and any plan-check comments.
- We size the review and send a written service agreement with the scope and fee.
- A site walk, if existing conditions matter.
- The review. We check the plans across disciplines and from the structural details back to the plans: missing details, conflicts, unbuildable sequences, access and logistics, and underground and site work nobody drew.
- Your package: a findings report and an RFI list ready to send to the design team, plus value-engineering options for the Engineer of Record to evaluate.
- A review meeting with you and, if you like, your design team.
What drives the cost
- The size of the plan set and the number of disciplines
- How complete the design is
- Whether a site walk or field verification is needed
- Whether you want a second pass after the design team answers the RFIs
What we do differently
We build the underground, site and structural work that plans often leave out, so we read for what isn't drawn as well as what is.
Why plan gaps cost so much
A gap in the plans doesn't disappear when the job is bid. It turns into an RFI in the field, a delay while the designer answers, and a change order once the answer costs more than what was priced. Catching it on paper, before the work is bid, is usually the cheapest point to fix it. A constructability-review paper published by the Construction Management Association of America recommends reviewing plans at the 90 and 100 percent design stages, before they go out to bid.
What we look for
- Details referenced on one sheet and missing from the set
- Conflicts between architectural, structural, civil and MEP sheets
- Underground utilities, storm drain, site walls and grading that are assumed but not drawn
- Sequences that can't be built as shown, or can't be reached on the site
- Shoring, dewatering, protection and access that someone will have to price
- Existing conditions the plans don't account for
Two generations of building from real-world plans
JF Prieto is a family-run, second-generation contractor, working in Los Angeles since 1978. For almost 50 years our crews have self-performed the trades that sit under and around a building: concrete, caissons and shoring, underground utilities, storm drain, septic, waterproofing, masonry and earthwork. We also run general contracting and construction management. That is where plan gaps show up first, and it is the experience we bring to your drawings.
What this is not
We do not design or engineer. Design and any changes stay with your architect and Engineer of Record; we identify gaps and options for them to evaluate. JF Prieto is a licensed contractor, not a law firm, and does not give legal advice.
See also why plan gaps become change orders, contract and plan review and locating and field verification.
Plans in progress? Call (800) 606-3880 or send a short description through the contact form. Family-run in Los Angeles since 1978. CA Lic. #525452 · Class A + B + Haz.
Common questions
Ready to talk about your project?
Send us the details and we will follow up with next steps, or call us directly.