Bid Review & Leveling
Three bids, three different totals, and none of them include the same things? We line the bids up against the plans and against each other, item by item, so you can see what each contractor included, excluded or assumed. You get a leveled comparison and the questions to send each bidder before you choose.

Who it's for
- Owners, HOA boards and property managers choosing between contractors
- Developers bidding out site work, utilities or concrete packages
- Design teams who want a contractor's read on the bids they received
How the work goes
- A first conversation about the project and what the bids are for.
- Send the bids and the plans they were priced from, plus any addenda and RFI answers.
- We size the review and send a written service agreement with the scope and fee before we start.
- The leveling. We break each bid into the same scope lines, mark what is included, excluded, allowanced or missing, and note where a bid did not follow the plans.
- Your package: a side-by-side leveling sheet, a list of clarification questions for each bidder, and the scope items to add or clarify before award.
- A review meeting by phone or video, so you can go back to the bidders with the same questions.
What drives the cost
- The number of bids and how detailed each one is
- The size of the plan set and the number of trades
- Whether you need bidder follow-up support after the leveling
What we do differently
We price these same trades ourselves, so we can tell when a line is missing, when an allowance is light, and when a low number is low because scope was left out.
Why bids don't line up
Bidders read the same plans differently. One includes the haul-off, another excludes it. One carries an allowance for unknown conditions, another assumes there are none. One prices the drawings, another prices what they think you meant. A low total can mean scope was left out, and the difference comes back later as change orders.
What we compare
- Scope included, excluded and "by others", line by line
- Allowances and assumptions, and whether they are realistic for the work
- Items on the plans that a bidder did not price
- Permits, testing, protection, staging, traffic control and cleanup
- Schedule and sequencing assumptions
- Payment terms and what each bidder expects up front
Decades on the bidding side
JF Prieto is a family-run, second-generation contractor, working in Los Angeles since 1978. We self-perform concrete, underground utilities, storm drain, septic, caissons and shoring, waterproofing, masonry and earthwork in-house, and we run general contracting and construction management. We have been on the bidding side of this work for almost 50 years, which is what lets us read a bid the way the bidder wrote it.
What this is not
JF Prieto is a licensed contractor, not a law firm, and does not give legal advice. We review the construction side of the bids: scope, pricing structure, schedule and field practicality. The choice of contractor is yours, and contract terms go to your attorney.
See also how to compare contractor bids, contract and plan review and pre-construction and owner's representation.
Bids on your desk? Call (800) 606-3880 or send a short description through the contact form. Family-run in Los Angeles since 1978. CA Lic. #525452 · Class A + B + Haz.
Common questions
Ready to talk about your project?
Send us the details and we will follow up with next steps, or call us directly.