How to Compare Contractor Bids When the Numbers Don't Line Up

November 22, 2026

Giulliano J. Prieto

Senior Construction Project Engineer · VP Project Management

Don't compare bid totals; compare scope. Break every bid into the same lines, mark what each one includes, excludes, allowances or leaves out, and check each against the plans. Then send every bidder the same clarification questions. A low number can mean scope is missing.

How to Compare Contractor Bids When the Numbers Don't Line Up

You sent out the plans and got three bids back. One is well below the others, one is well above, and the middle one has a page of exclusions. It is tempting to pick the low number. Before you do, make sure all three are pricing the same job.

Why bids don't match

  • Different reading of the plans. Where the drawings are unclear, each bidder fills the gap differently.
  • Exclusions. Haul-off, permits, testing, protection, traffic control and cleanup often sit in fine print.
  • Allowances. One bidder carries a realistic allowance for unknowns; another carries a smaller number.
  • "By others." Work assigned to someone else, who may not exist on your project.
  • Assumptions. Access, working hours, staging and schedule that may not match your site.

How to level bids, step by step

  1. Build one scope list from the plans, trade by trade.
  2. Map every bid onto that list: included, excluded, allowance, or not mentioned.
  3. Flag anything on the plans that no bid priced. That is a plan gap, and it goes to your design team.
  4. Compare allowances to what the work really takes.
  5. Write the same clarification questions to every bidder and ask for written answers.
  6. Re-compare once the answers are in.

Questions worth asking every bidder

  • What is excluded that the plans show?
  • What allowances are carried, and what happens if they run over?
  • What did you assume about access, hours, staging and existing conditions?
  • Who provides permits, testing and inspections?
  • What is due before work starts, and how are progress payments tied to the work?

Why a contractor is the right person to level bids

We are a family-run, second-generation contractor, working in Los Angeles since 1978. For almost 50 years we have priced and built concrete, underground utilities, storm drain, septic, caissons and shoring, waterproofing, masonry and earthwork in-house, and we run general contracting and construction management. We have written these bids ourselves, so we know when a line is missing, when an allowance is light, and when a low number is low because scope was left out.

What we don't do

We don't choose your contractor and we don't give legal advice. We give you a construction-side comparison and the questions to ask; the decision is yours, and contract terms go to your attorney.

Frequently asked questions

Should I just take the lowest bid?

Only once you have confirmed it includes the same scope as the others. A low bid with missing scope can cost more by the end of the job.

How many bids should I get?

Enough to compare, usually three, but only if all of them priced the same plans and addenda.

Can you review bids we already received?

Yes. Send the bids and the plan set they were priced from.

See our bid review and leveling service.

Bids on your desk? Call (800) 606-3880 or send a short description through the contact form. Family-run in Los Angeles since 1978. CA Lic. #525452 · Class A + B + Haz.

Share this article

Email Facebook LinkedIn X WhatsApp Text

Sources

  • JF Prieto field practice. General information, not legal advice.

Questions about your property?

Send us the details and we will follow up with next steps, or call us directly.