Budget, Contingency & Funding-Gap Review

Projects rarely run out of money all at once. They run out a change order at a time, when plan gaps, light allowances and missing scope eat the contingency. We review your budget, contracts and plans together and show where the funding is exposed, so you can adjust the scope or contingency, or take the numbers to your lender, before construction starts.

JF Prieto dump trucks at the yard

Who it's for

  • Owners and developers setting a construction budget or loan amount
  • HOA boards planning a special assessment or reserve draw for a project
  • Owners already in construction who see the contingency going faster than expected

How the work goes

  1. A first conversation about the project, the budget and where the money comes from.
  2. Send the budget, the plans and the contracts or bids behind it, plus the draw or payment schedule.
  3. We size the review and send a written service agreement with the scope and fee.
  4. The review. We check the budget line by line against the plans and the contracts: missing scope, allowances that look low, owner-paid items nobody carried, and contingency against the real risk on the site.
  5. Your package: a findings report showing where the budget is exposed, the scope and RFI items that drive that exposure, and the questions to raise with your contractor.
  6. A review meeting with you, your board or your lender contact.

What drives the cost

  • The size of the budget and the number of contracts behind it
  • How complete the plans are
  • Whether construction has started and draws must be reviewed too

What we do differently

We know what this work really takes in the field, so we can tell when a budget line, an allowance or a contingency won't survive the site.

How projects run short

The pattern is familiar. The budget is set from an early estimate. The plans keep moving. Allowances are set before the details are known. Owner-paid items like permits, utility fees, testing and inspections are left out. Then the site turns up something the plans didn't show, and each change order takes another piece of the contingency. By the time the shortfall is obvious, the money is already committed.

What we look for

  • Budget lines with no matching scope on the plans, and scope with no budget line
  • Allowances that look low for the work they cover
  • Owner-paid costs nobody carried: permits, agency and utility fees, testing, special inspections
  • Site risks the contingency doesn't reflect: soils, groundwater, access, existing utilities
  • Payment and draw schedules that run ahead of real progress
  • Plan gaps likely to become change orders

Seeing where the money goes

JF Prieto is a family-run, second-generation contractor, working in Los Angeles since 1978. For almost 50 years we have self-performed a wide range of trades in-house and run general contracting and construction management, so we have priced, built and managed the lines your budget is built on. That is how we spot the ones that won't hold.

What this is not

We are not your lender, accountant or attorney, and this is not financial or legal advice. We review the construction side: scope, plans, pricing structure and field risk. Financing and contract decisions stay with you and your advisors.

See also why construction projects run out of money, contract and plan review and bid review and leveling.

Budget feeling tight? Call (800) 606-3880 or send a short description through the contact form. Family-run in Los Angeles since 1978. CA Lic. #525452 · Class A + B + Haz.

Common questions

Ready to talk about your project?

Send us the details and we will follow up with next steps, or call us directly.