Got a Sidewalk Repair Notice in Los Angeles? Permits and the Safe Sidewalks LA Rebate
If the City of Los Angeles sent a sidewalk repair notice, apply to Safe Sidewalks LA before any work starts. The City inspects, emails a Rebate Offer and waives the Class A-Permit fee. A contractor with an A, C-8, C-12 or C-61/D-06 license must finish the work within 90 days of the permit, and the City mails the rebate after it certifies the work.

A sidewalk repair notice from the City of Los Angeles usually means the sidewalk in front of your property does not meet accessibility standards, often because tree roots lifted the panels. You have two paths: repair it under a regular permit, or apply to the City's Safe Sidewalks LA rebate program first.
Apply before any work starts
If you want the rebate, do not finish the work first. Work completed outside a Rebate Offer does not qualify. The City's checklist, step by step:
- Apply. Online at sidewalks.lacity.gov or by calling 311, and upload proof of ownership.
- Send any extra documents the City asks for, such as a grant deed, trust or LLC agreement, within 14 days.
- The City inspects the sidewalk and calculates the Rebate Offer.
- Accept or decline the offer within 14 days of the City's email.
- Hire a licensed contractor within 60 days of accepting. The contractor needs an A, C-8, C-12 or C-61/D-06 license.
- Pull the permits within 60 days of the Rebate Offer email, using only the link in the offer email: the no-fee Class A-Permit and any tree removal or root pruning permit. Do not go to a public counter. The contractor's license number is required before the permit is granted.
- Hold the pre-construction meeting with the Bureau of Contract Administration before work starts: (213) 485-5080 or bca.lacity.org.
- Build and request the final inspection, all within 90 days of the permit being issued.
- The City certifies the work and issues a Sidewalk Certificate of Compliance. The warranty period starts then.
- Send your IRS W-9 within 30 days of the City's request, in person or by U.S. mail. Online copies are not accepted.
- The City mails the rebate check within 30 days of receiving the W-9.
How much the rebate covers
Since August 25, 2023, the City lists a rebate cap of $12,400 per lot for residential properties, and the same for commercial and industrial properties. The offer itself is calculated from the work quantities and the City's unit prices, so the actual amount depends on your sidewalk. It may not cover the full repair, so plan on paying the difference. All new applications are currently placed on a wait list, and the City reports delays due to new funding restrictions.
Who can do the work
The City requires a contractor holding a California A, C-8, C-12 or C-61/D-06 license, and the license number has to be provided before the permit is granted. You hire and pay the contractor directly; the City does not pay contractors, and the rebate comes to you after the work is certified. The City also keeps a reference list of sidewalk contractors for rebate applicants; it does not endorse the contractors on it. JF Prieto Engineering Construction, Inc. is on that list and holds CA Lic. #525452 · Class A + B + Haz, including the Class A General Engineering license.
Tree roots
A City arborist decides what tree work is needed, which can include enlarging the planting area, pruning roots or removing the tree. Following the arborist's recommendations is a condition of the rebate. If a tree is removed, the City requires two replacement trees for each tree removed. Trees on private property are not eligible for the rebate.
Roots are also the most common reason a new sidewalk lifts again, so we talk through how the roots will be handled with you and the City before we pour.
Driveways
Driveway sections that cause the sidewalk to be non-compliant can be included up to the property line, according to the City's program rules.
Not every repair qualifies
Sidewalk work required by a building permit or a similar requirement is not eligible, and neither are properties in development projects. If your repair is tied to a building permit, we price it as regular right-of-way work.
The warranty after certification
Once the City certifies the repair, it warranties the sidewalk for 20 years on residential properties and 5 years on commercial and industrial properties, with one City warranty repair. After that, maintenance returns to the owner.
What we need from you
Send us the City's notice or the Rebate Offer, plus a few photos of the sidewalk. We price the full repair to the City's standard plans so you can see how much the rebate covers and what is left. We give you our license number for the permit, attend the pre-construction meeting, build to the City's standard plans and request the final inspection, all inside the City's 90-day window.
See our Concrete and Right-of-Way Work services.
Program rules change. Check Safe Sidewalks LA before you count on a rebate.
CA Lic. #525452 · Class A + B + Haz
