The LA County Septic Evaluation Form: What It Is and How to Pass It
LA County asks for an Existing OWTS Evaluation when you remodel, add on or rebuild on septic and the system is over 15 years old, has no plans on file, or no longer matches the house. A contractor with license type A, C-42 or C-36 opens the system, records the tank and dispersal condition, and certifies the form. It is valid for one year.

Many owners first hear about it at the permit counter: Building and Safety or Regional Planning refers the project to Public Health, and Public Health asks for an evaluation of the existing septic system. It sounds like a hurdle. Done early, it is the cheapest way to find out whether your plans work with the septic you already have.
When the County asks for it
- The system is more than 15 years old according to the plans on file.
- There are no plans on file, or the plans do not match the house as it is today.
- You are adding rooms, bedrooms or structures beyond the footprint (a garage, a pool, a deck), or adding an ADU.
- You are rebuilding after a fire on the existing system.
The form is for project reviews. It is not the same as a point-of-sale inspection for a home sale.
What the contractor records
- The tank: material, size, number of chambers, sludge and scum depth, effluent filter, and any sign of overflow.
- Whether the tank was pumped for the inspection.
- The dispersal system: leach lines or seepage pits, their dimensions and condition.
- A condition rating for each part, prior approvals, setbacks, any expansion area, occupancy and a site plan.
That means every part has to be found and opened. Buried lids and unknown pits are the usual cause of delay, so locating comes first.
Who can sign it
The County form is certified by a licensed contractor holding license type A, C-42 or C-36. The evaluation is valid for one year from its date, so time it to your permit submittal.
How it is submitted
The evaluation goes to the Public Health land use program with the referral from Building and Safety or Regional Planning, a site and floor plan and a scaled plot plan. Public Health lists a review time of up to 20 business days.
If the system does not pass
A failed part is not always a failed system. A cracked lid, a broken baffle, a clogged distribution box or a tired seepage pit can often be repaired, and a pit that is slowing down can often be rested and recovered. If the system cannot carry what you want to build, the next step is a feasibility report by a qualified professional to size an upgrade or a new system. If a public sewer is within 200 feet, the County may require a sewer connection instead.
Where we fit
We disclose and outline everything about your septic system, then get it certified and working. J.F. Prieto Engineering Construction holds a California Class A General Engineering license (CA Lic #525452). We locate and open every part of the system, pump and inspect it, complete and certify the County evaluation form, and give you the repair options in writing. When the project needs a feasibility report or a new design, we coordinate it with licensed engineers and geologists. Your expediter files the permits with Public Health, or we file them when needed. Call (800) 606-3880 or request a site visit, and you get our findings in writing.
Rules change. Before you commit to a plan, check the current County guidance or call the Onsite Wastewater Treatment Program at (626) 430-5380.
Sources
- LA County Public Health, Evaluation Form, Existing OWTS Project Reviews (rev. May 2021)
- LA County Public Health, Requirements and Procedures for Conventional and Non-Conventional OWTS (updated 2025)
- LA County Public Health, OWTS Review Application Package (rev. May 2021)