Ready to Dig: What a Cal/OSHA Annual Trench Permit and a City of LA Sewer Bond Mean for Your Project
JF Prieto Engineering holds a Cal/OSHA annual trench and excavation permit (T-1) and is on the City of Los Angeles approved Bonded Sewer Contractor list. The annual permit lets our crews start trenches 5 feet or deeper after at least 24 hours' written notice to Cal/OSHA, without a project permit. The City bond lets us obtain sewer permits for work in the street.

Your trench is 6 feet deep and the schedule says dig Monday. Or the sewer just backed up and the break is under the street. Either way the question is the same: who can legally start this work, and how fast?
The answer comes down to three things a contractor either has in place before you call, or has to go and get. We call them the three pillars of a ready-to-dig contractor: licensed, Cal/OSHA permitted and City-bonded.
Underground work done safely and signed off, by a bonded and licensed Cal/OSHA T-1 excavation contractor.
Pillar 1: Licensed
JF Prieto Engineering Construction, Inc. is a family-run Los Angeles contractor, working since 1978. Our license is CA Lic. #525452 · Class A + B + Haz. Class A is the General Engineering license that covers underground and civil work. Class B is General Building. That license is also one of the requirements for Pillar 3, the City sewer bond.
Pillar 2: Cal/OSHA permitted, all year
California Labor Code §6500 and Title 8 §341 require a Cal/OSHA permit before anyone builds a trench or excavation 5 feet or deeper that a worker has to enter. Cal/OSHA issues two kinds of permit.
- Project Permit. Covers named locations on one project. It is applied for at the Cal/OSHA district office, and Cal/OSHA issues it within five working days of the safety conference once the application is complete.
- Annual Permit. Lets a qualifying employer do permit-required work at any jobsite for one year. Before each new site, the holder sends the district office written notice, at least 24 hours ahead, of the location and the date and time work starts.
JF Prieto Engineering holds a Cal/OSHA annual trench and excavation permit (T-1), renewed every year. Before each job we send the 24-hour notice, and a copy of the permit is kept at the jobsite, as Title 8 §341.4 requires.
What that means for contractors, developers and builders
- No project permit wait for our scope. When you hire us for the trench and excavation work, our crews work under our own annual permit. Our part of the job does not wait on a project permit application and safety conference.
- Notice, not an application. Once your other permits and approvals are in hand, we send Cal/OSHA the 24-hour notice and plan the start date with you.
- One crew from dig to backfill. We excavate, shore, build the pipe or structure, backfill and restore. Where an engineered shoring design is required, a licensed engineer designs it and we build it as the contractor's means and methods.
One limit to know: the annual permit covers the work our crews do. Any other employer whose workers build a permit-required trench on the same site needs its own coverage.
Pillar 3: Bonded with the City of Los Angeles
In the City of Los Angeles, only approved Bonded Sewer Contractors can obtain sewer permits for construction in the public right-of-way. That covers a new sewer lateral where none exists and repairs to the part of a lateral under the street. To be on the list, a contractor needs a qualifying license, a sewer connection bond, liability insurance naming the City, a City business tax registration and a notarized list of who may pull permits, all on file with the Bureau of Engineering and renewed every year.
JF Prieto Engineering is on the City's approved Bonded Sewer Contractor list. Our bond and insurance are already on file.
What that means when a sewer fails
When a lateral breaks under the street, a homeowner cannot hire just any plumber or contractor for the street work. It has to be a bonded sewer contractor. Because our City bond is already on file and our Cal/OSHA permit is already in place, we can apply for the City sewer permit and send Cal/OSHA notice once we have seen the problem, without first having to qualify. We respond 24/7, based on crew availability.
Two things still apply. Clearing a stoppage does not need a City permit, but replacing pipe or digging in the street, sidewalk or a sewer easement does. And the City's permit and inspection steps run on the City's schedule, so we give you dates once the City sets them.
What it means for homeowners
- A repair that is permitted, inspected and signed off by the City.
- The documents LA Sanitation's lateral repair rebate asks for, including the signed final permit. The rebate also asks for a licensed and bonded sewer contractor. See Sewer Lateral Repair in Los Angeles: Who Is Responsible, Permits and LA Sanitation Rebates.
- One crew from the camera inspection to the street restoration.
What it does not mean
- It is not a promise of permit dates. Agencies set those.
- It is not design. Licensed engineers prepare the plans and stamped drawings; we build to them.
- It does not mean we file every permit. The City street sewer permit has to come from a bonded sewer contractor, so we obtain that one. Building permits and plan approvals are usually filed by your expediter or architect, and we file them when needed.
- We work on private projects.
The short version
Underground work done safely and signed off, by a bonded and licensed Cal/OSHA T-1 excavation contractor. If your project needs a trench, a sewer lateral, a new connection, a sewer main or manholes, call (800) 606-3880 or request a site visit, and we will tell you what permits the job needs and who files each one. See our Sewer Lateral Repair and Installation and Underground Utilities services.
Frequently asked questions
Do I need a Cal/OSHA permit for a 4-foot trench?
The permit applies to trenches and excavations 5 feet or deeper that a worker has to enter. Shallower trenches still have to follow Cal/OSHA's excavation safety rules.
Does your annual permit cover my crew?
No. It covers the work JF Prieto Engineering's crews do. Each employer whose workers build a permit-required trench needs its own coverage.
Can any plumber fix my sewer lateral under the street?
Not in the City of Los Angeles. Sewer permits for work in the public right-of-way go only to approved Bonded Sewer Contractors. A connection at the property line to an existing lateral is the exception.
How do I check that a contractor is bonded with the City?
Ask them to confirm they are on the Bureau of Engineering's approved Bonded Sewer Contractor list, and check their license on the CSLB website.
CA Lic. #525452 · Class A + B + Haz
Sources
- City of LA Bureau of Engineering, Permit Manual: S Permit Purpose and Definition
- City of LA Bureau of Engineering, How to Become a Bonded Sewer Contractor (package)
- City of LA Bureau of Engineering, Permits FAQ (main line connection)
- City of LA Bureau of Engineering, What is a Class B Permit
- LA Municipal Code Sec. 64.12, House Sewer Connection Permit
- City of LA Ordinance 180158 (LAMC 64.20(c) saddles; 64.15.1(b) bond)
- LA Sanitation, Sewer Lateral Repair Rebate
- California Labor Code Sec. 6500
- Cal/OSHA, Title 8 Sec. 341 (permit-required activities; Annual and Project Permits)
- Cal/OSHA, Title 8 Sec. 341.1 (applications; 24-hour notice for Annual Permits; five working days for Project Permits)
- Cal/OSHA, Title 8 Sec. 341.4 (posting of permit)
- Cal/OSHA, Permit Requirements for Construction Activities (FAQ)